Bangkok, TH  ·  Est. 1979

MicrofiberContact →

Microfiber

/

Knowledge Hub

Field notes fromforty-six years of fiber.

Case studies, design tips, insider posts, and videos from our engineers, installers, and the architects we work with.

Categories

How a Bangkok auditorium hit RT60 under 1.2 seconds.

Case study

·

8 min read

How a Bangkok auditorium hit RT60 under 1.2 seconds.

Read case study →
The three mistakes architects make specifying duct wrap.

Design tip

·

4 min read

The three mistakes architects make specifying duct wrap.

Why bio-based binders changed our flagship product.

Insider

·

6 min read

Why bio-based binders changed our flagship product.

A closed-loop water system, explained by the engineer who built it.

Sustainability

·

5 min read

A closed-loop water system, explained by the engineer who built it.

Video

·

3 min read

Installing MicroWhite over steel framing — field walkthrough.

Case study

·

9 min read

Refining Unit 4: MicroHi-Temp for 2,400m of process piping.

Design tip

·

3 min read

Sound absorption vs. isolation: what architects confuse.